South Walker Creek - Substation Installation
This is a description of the project that you can put in to talk about it when someone clicks on the pin on the map.
-
Dalrymple Bay Coal Terminal
Telemetry Upgrade of Conveyor System. Duration - 5 months
-
Peak Downs Coal Mine - Dragline 8 Shutdown
Upgrade of 1370 Dragline, Full Rewire & Drive Upgrade. Duration - 4 Months
-
Saraji Coal Mine - Train Load Out Upgrade
Upgrade of TLO including commissioning of new Substation & new control system. Duration 3 months
-
Ulan Coal Mine - Dragline Shutdown 8050
Upgrade of 8050 Dragline, Full Rewire & PCR Installation. Duration - 3 Months
-
Daunia Mine - ERS Construction (7495)
Electrical Construction of CAT 7495 Electric Rope Shovel. Duration - 6 months
-
Curragh Mine - Dragline Shutdown
Upgrade of 8200 Dragline, Full Rewire & Drive Upgrade. Duration - 3 Months.
-
Peak Downs Mine - TLO Upgrade
Upgrade of TLO including commissioning of new Substation & new control system. Duration 3 months.div>
-
Caval Ridge Mine - ERS Construction (7495)
Electrical Construction of CAT 7495 Electric Rope Shovel. Duration - 6 months.
-
Abbot Point Coal Terminal - Outloading String 1.
Brownfield upgrade of Outloading String 1. Duration - 12 months
-
Tarong Energy Coal Mine - Dragline Shutdown 1370W
DCS PCR Upgrade on 1370W including full rewire.
-
BMA Pump Station Upgrades
Upgrade of BMA Pump stations across the Bowen Basin- Binegang, Bedford East, Bedford West, Blackwater, Selma & Eungella.
-
Curragh - Dragline Shutdown 8750
Full rewire and Drive upgrade of 8750 Dragline. Duration 4.5 Months
-
Peak Downs DRE42 - Supply of Electrical Project Management, electrical supervision (leading hands) and commissioning services